Client:SOA Department of Natural Resources
Date:March 21, 2016

Tonsina Cr Bridge Repair, Seward, AK. $214,000, 2012.

Tutka replaced a foot bridge that was washed away by the flooding of the Tonsina Creek which is located in Resurrection Bay. We also repaired erosion caused by the flooding on the trail that runs from Lowell Point to Caines Head.

Work included: Mobilization of equipment, personnel and supplies to the site via landing craft barge, pile driving, snow road construction, excavation, pile driving, bridge construction, trail grading, and leveling course import with narrow width and LGP equipment